The field campaign for the Arran project started in October with the construction of one of three 30m masts. The masts are going up on a ridge on the north-east of the island over-looking the sea. Each mast will be bedecked with instruments to measure various properties of the air-flow as it interacts with the ridge and the trees. This is Andy, Cathryn and Jenn putting the finishing touches onto mast number one.
1 comment:
Captured in its final moments and in the perilous hands of Rosey the destroyer. Could it be 'Mast 1' down? God bless the rest!
Post a Comment